Synchronising TWO DL1 run files possible?

Kris
Posts: 13
Joined: Fri Aug 01, 2008 12:15 am

Synchronising TWO DL1 run files possible?

Postby Kris » Wed Feb 25, 2009 9:02 pm

Hi

I'm using two independent DL1 data loggers to record vehicle accelerations on a railway vehicle to ascertain relative body bogie accelerations. I have both loggers fitted to each end of the vehicle, and have external accelerometers connected to bogies to measure three dimensional accelerations. They are set to record at a GPS speed of >3km/h and are 50MB files that aren't in synch from the start.

I'm also not recording RAW GPS data to save card space as the units are recording for several days at 100Hz sample rate (could be pursuaded if this data is useful though).

I'm having difficulty superimposing the accelerometer accelerations on the analysis software (7.3.38). The speed/ acceleration data appears to be out of synch by 13 seconds between each data logger run file.

When I set the graph X axis to use GPS time the accelerations then appear synchronised but the acceleration data becomes very distorted (looking like spikes and squares instread of sinusiods), as does GPS speed. This distortion changes but doesn't reduce when GPS time is then smoothed over 1000 seconds.

Is there any way to synchronise the time between different files to a GPS time stamp and have synchronised data that isn't distorted by the process?

If this isn't possible, is it possible to manually shift both time bases on the x axis so the accelerations are correctly overlayed (i.e use longitudinal shock accelerations to synchronise the time base)?

Thanks!

Kris

tristancliffe
Posts: 220
Joined: Thu Mar 15, 2007 3:41 pm
Location: Norwich, UK
Contact:

Postby tristancliffe » Wed Feb 25, 2009 10:09 pm

Could you trim the run file that starts first (Run Manager, Reduce Run Length [I think]) by 13 seconds? Might take a bit of trial and error, but should leave you with good data, shifted to where you want it.
Monoposto 2000 - Reynard 883 Toyota

Kris
Posts: 13
Joined: Fri Aug 01, 2008 12:15 am

Postby Kris » Thu Feb 26, 2009 6:31 am

tristancliffe wrote:Could you trim the run file that starts first (Run Manager, Reduce Run Length [I think]) by 13 seconds? Might take a bit of trial and error, but should leave you with good data, shifted to where you want it.


An excellent idea Tristan, I'll give it a go. It's just a shame the data would synchronise with GPS time as the trimming accuracy is as good as my ability to measure the time shift between the two signals, and I'll be looking at the phase of the external accellerometer signals for each end of the vehicle to identify how it's riding on the track (currently not that well as bits tend to fall off (air reservoirs, twistlocks etc).

Next job will be to try out a VIDEO4 and a couple of bullet cameras...

faraday
Posts: 267
Joined: Sun Feb 25, 2007 1:18 am

Postby faraday » Thu Feb 26, 2009 11:52 am

There are simpler ways to do this.
Email me: rotoflow at optusnet dot com dot au and we can discuss
:wink:


Return to “General software support”

Who is online

Users browsing this forum: No registered users and 199 guests